
Lithium Brine Projects
The Yilgarn Craton contains a number of playas which are prospective for lithium enriched brines. In a review of Australian playas by Geoscience Australia, the Yilgarn Craton was identified as one of several regions ranked favourably to host lithium enriched brines. Lake Dundas (E63/1804) and Lake Cowan (E15/15320) were highlighted as having the highest lithium...
DetailsMount Venn
The Mt Venn Gold Project is located 125km northeast of Laverton in the Eastern Goldfields Region of Western Australia (Figure 1). Woomera has purchased an initial 80% interest in the project from Cazaly Resources Ltd (ASX:CAZ) (“CAZ”) which has retained a 20% interest in the project through the establishment of an unincorporated Joint Venture. The...
DetailsCarulinia
The Carulinia Project is 10km west of Oodnadatta on the Torrens Hinge Zone, which is a complex structure defining the eastern margin of the Gawler Craton Figure 1). The primary exploration focus at this tenement is a large coincident gravity and magnetic anomaly which displays striking similarities to that of BHP’s Olympic Dam and OZ...
DetailsNAWA
The NAWA project comprises three tenements, EL 5116 (923 Kms2), ELA 2012/00119 (922 Kms2) and ELA 2012/00120 (848 Kms2.) that are centred 150Kms west of Coober Pedy and 100Kms north of the Challenger gold mine (Figure 1). The NAWA Domain lies in the north west of the Gawler Craton and covers an area of approximately...
DetailsMount Cattlin WA
The Mt Cattlin Project is located along the boundary of the Ravensthorpe Terrane, which forms part of the Archaean Ravensthorpe greenstone belt, which lies along the boundary between the Youanmi and Southwest regional terranes of the Yilgarn Craton. The Mt Cattlin Project is considered prospective for hard rock lepidolite and spodumene mineralisation based primarily on...
DetailsPilgangoora
The Company’s three Pilgangoora Project tenements lie within the Pilbara Craton, between 60km and 110km south east from Port Headland, within close proximity to the following world-class pegmatite hosted projects including: Pilbara Minerals Ltd: Mineral Resource of 156.3Mt @ 1.25% Li2O and 128ppm Ta2O5 – ASX: PLS Altura Mining Ltd: Resource 40.3Mt @ 1.0% Li2O...
DetailsLabyrinth
The Labyrinth Project (EL 5113) covers an area of 266 Sq. Kms and lies within Woomera Prohibited Area (WPA) in the central Gawler Craton about 30 Kms North West of Kingoonya and 40 Kms North East of Tarcoola between the Stuart Highway and the Adelaide-Darwin in rail (Figure 1). The Labyrinth Project is prospective for:...
DetailsAlcurra-Tieyon
The Musgrave Alcurra-Tieyon Project consists of four granted tenements, of which the Stuart Highway and the Adelaide-Darwin railway pass through the project area (Figure 2). The Company’s exploration focus in the area is on Ni-Cu-Co and PGE targets. A Native Title Mining Agreement has been executed with the Tjayuwara-Unmuru Aboriginal Corporation (TUAC) which is the...
Details